Overview
KFUPM Today is the university's daily release of news, events, maintenance notices and other updates for more than 15,000 campus readers. Anyone with a KFUPM email address can submit content.
It began as Daily Digest, run by IT. When it moved to our department, it needed stronger editorial governance and a design that matched the university's evolving brand. I studied how the old process worked, redesigned the release, standardized how content is submitted and reviewed, helped staff adopt the new process, and later designed a single platform for the whole workflow. That platform was built after I left KFUPM and is now in use.
Where It Started: A Hand-Assembled Email
Contributors emailed their content in whatever form they liked: Arabic and English text, dates, times, locations, links. An administrator copied each item into a separate release generator, typed category names by hand and pasted icon links from cloud storage. One misspelled category created a duplicate. The finished release was exported as HTML, pasted into an email and sent to university groups.
Before the handover, I met the previous IT team to map this process. It relied on repetitive manual transfers, received inconsistent information, and had no clear editorial rules.

Stage 1: Structure Before Software
I researched daily communications from other universities and organizations and ran an ideation session with our content team. Management renamed the release KFUPM Today, and I redesigned its layout using the research, the team's feedback and the developing brand guidelines.
To fix the inputs, I created an online submission form and wrote Submission Guidelines so contributors knew what was required up front. I also created a revision template, a Word document with predefined tables and review criteria, that content and design reviewers filled in to state acceptance criteria and request changes.
I worked with IT to make the Wagtail CMS usable for non-technical staff and to keep the built release faithful to the design. While the new process settled in, I sat in on design reviews, coordinated new submissions between the administrator and the content team, and ran demonstrations of Wagtail and the revision template for both teams.
Stage 1 standardized submissions and reviews, but approved items still had to be typed into Wagtail by hand.


Stage 2: One Platform for the Whole Workflow
Submitters, reviewers and the administrator still worked across separate tools. I designed and proposed a single platform that brought the steps together:
- Guided submissions
- Submission status tracking
- Content and design review with accept or revise decisions
- Feedback and resubmission
- Automated confirmations and emails
- Release preparation and sending, connected to the rest
With around 30 submissions arriving each week, the platform makes every step easier: submitting, tracking, reviewing, revising and publishing. I proposed it before leaving KFUPM; it was built afterwards by others and is now running.

| Aspect | Stage 0: Daily Digest | Stage 1: KFUPM Today | Stage 2: Unified Platform |
|---|---|---|---|
| Submission | Unstructured email | Standardized online form | Integrated submission |
| Review | Not fully documented | Content and design reviews with a Word revision template | Integrated review, feedback and revision |
| Release preparation | Manual release generator | Manual entry into Wagtail | Connected release preparation |
| State | Historical | Implemented during my time | Proposed before I left; built afterwards |
Daily Digest
- Submission
- Unstructured email
- Review
- Not fully documented
- Release preparation
- Manual release generator
- State
- Historical
KFUPM Today
- Submission
- Standardized online form
- Review
- Content and design reviews with a Word revision template
- Release preparation
- Manual entry into Wagtail
- State
- Implemented during my time
Unified Platform
- Submission
- Integrated submission
- Review
- Integrated review, feedback and revision
- Release preparation
- Connected release preparation
- State
- Proposed before I left; built afterwards
Outcome
The release went from a hand-assembled email to a structured, centralized publishing process. Both the redesigned release and the platform were implemented. After launch, the KFUPM Today team told me that the daily work which used to take 3–5 hours now takes under 30 minutes. Along the way, the work also gave the release written guidelines and a standard set of content categories, which ended the duplicates caused by typos.
Looking Back
The hardest part was the review process. Reviewers filled in the Word template by hand, and their feedback then had to reach submitters separately. If I did it again, I would replace the template with e-forms from the start, so feedback reaches submitters more easily.

